INSTRUCTION BOOK FOR UTB Contour
Included Hardware Tools Required for Installation Large Wall Bracket (47”) (1) Screens under 104" in viewing width (2) Screens 104" and over in viewing width Phillips Screwdriver Small Bottom Wall bracket (8”) (1) Screens under 104" in viewing width Large Bottom Wall bracket (44”) (1) Screens 104" and over in viewing width Tape Measure Frame Brackets (1) Screens under 104" in viewing width (2) Screens 104" and over in viewing width #10 X 3/8" Silver Screws (12) 8-32 X 3/8" Machine Screws (4) #10 X
Inner Frame & Viewing Surface Assembly 1. Create a clean work area for assembly using a soft clean material. This will protect the inner frame and ensure a clean projection surface. 2. Unwrap frame pieces. Assemble inner frame pieces on the work area. 3. Slide inner frame pieces together at corners. Secure inner frame pieces with (12) #10 x 3/8" silver screws (Figure 1). 4. Set the assembled inner frame aside. Unroll screen surface and place it viewing side down on the clean work area. 6.
Outer Bezel Assembly 1. Position outer bezel pieces on all sides (Figure 3a). Gently lift and slide each outer bezel piece around the inner frame and viewing surface assembly (Figure 3b). 2. Align corners and insert one 8–32 x 3/8" screw in each corner to attach the outer bezel onto the inner frame assembly (Figure 4). Top Outer Bezel 3. Secure the outer bezel to the inner frame by inserting the #10 x 3/8" black screws into each of the large holes on all four sides of the screen (Figure 5).
Outer Bezel Assembly (continued) 4. Depending on the size of your screen, you will have one or two frame brackets. a. For screens under 104” wide viewable, attach (1) frame bracket to the bottom of the screen with (2) #10 x 3/8" pointed BLACK screws (Figure 6). b. For screens 104” wide viewable and over, attach (2) frame brackets If your screen is 104" or over in viewing area width (Figure 7). 5. Insert 8-32 x 1/2" zinc plated fillister screw into frame bracket(s) (Figure 6 or 7).
Installation of Screens Under 104" in Viewing Width 1. Secure the large top wall bracket to wall studs at the desired height. Make sure the bracket is level. The top of the screen will be 2–1/4" above the top of the edge of this wall bracket when mounted. You will need at least a 3" clearance above the bracket to hang the screen (Figure 8). 2. To install the small bottom wall bracket, you must measure the overall height of the screen and subtract 3". Find the center point of the top wall bracket.
Installation of Screens 104" and Over in Viewing Width 1. Secure the (2) large top wall bracket to wall studs at the desired height. Make sure the brackets are level. The top of the screen will be 2–1/4" above the top of the edge of this wall bracket when mounted. You will need at least a 3" clearance above the brackets to hang the screen (Figure 9). 2. To install the large bottom wall bracket, you must measure the overall height of the screen and subtract 3".
LIMITED ONE YEAR WARRANTY ON DA-LITE PRESENTATION PRODUCTS Milestone AV Technologies LLC warrants certain Da-Lite branded products to the original purchaser only, to be free from defects in materials and workmanship for a period of one (1) year from the date of purchase by the original purchaser; provided they are properly operated according to Da-Lite’s instructions and are not damaged due to improper handling or treatment after shipment from the factory.