Repair Manual

AIR CONDITIONING
62
62 - 2
TIGHTENING MOMENTS
Thread 1” (14 steps / 1”) 2,5
Thread 3/4” (16 steps / 1”) 1,6
Thread 5/8” (18 steps / 1”) 1,6
The tank filter attachment screw M6 0,44
The tank filter support attachment screw M5 0,5
The upper condenser attachment screw M6-16 1,1
The clip nut pipes attachment clamp on cross - bar 0,1
The compressor attachment screws on supports 3,5
Compressor shaft attachment screw 3,5
The compressor belt tightener nut 3,5
The alternator bracket nut 1,25
The alternator attachment screw on support 2,4
Pressure controller couple 0,7
TIGHTENING MOMENTS
( daNm )
DRAINING – FILLING REFRIGERANT CIRCUIT
DRAINING
Connect the charging equipment piping to the filling-draining valves.
Perform the vacuuming of the air condition system, recovering the oil and the refrigerant fluid.
Close the hoses valves.
Disconnect the charging equipment piping and stop the equipment.
FILLING
Attach the draining filling hoses of the equipment to the air conditioning valves.
Put compressor oil type SP 10 in the charging equipment vessel.
Set the quantity of the refrigerant fluid which must be charged (0,700 kg).
Observe the filling instructions prescribed by the equipment producer.
GENERALITIES
vnx.su