User Guide
Table Of Contents
- Important Information
- Safety information
- What you need to know about the safety instructions
- Important safety symbols and precautions:
- State of California Proposition 65 Warning
- Important safety precautions
- Severe warning signs for transportation and site
- Critical installation warnings
- Installation cautions
- Critical usage warnings
- Usage cautions
- Cleaning cautions
- Critical disposal warnings
- Installation
- Operations
- Control panel
- Setting the desired temperature or function
- Turning on or off the AutoFill Pitcher
- Turning on or off the ice maker
- Changing the temperature scale
- Turning on or off the Peak Demand function
- Activating or deactivating the Sabbath mode
- Activating or deactivating the Cooling Off mode
- Resetting or dismissing the water filter replacement alarm
- SmartThings
- SMART GRID Function (Demand Response)
- Special features
- Maintenance
- Troubleshooting
- Warranty
- Regulatory Notice
- Open Source Announcement
Installation
English32
Installation
STEP 6 Connect the water dispenser line
A water dispenser with a lter is one of the helpful features on your new refrigerator. To
help promote better health, the water lter removes unwanted particles from your water.
However, it does not sterilize or destroy microorganisms. You may need to purchase a
water purifying system to do that.
The water line also connects to the ice maker. For the ice maker to operate properly, water
pressure must be between 30-125 psi (206-861 kPa).
If the refrigerator is installed in an area with low water pressure (below 30 psi / 206 kPa),
you can install a booster pump to compensate for the low pressure.
After you have connected the water line, check if the water dispenser works properly.
Press the water dispenser lever until the water runs from the water outlet.
NOTE
• Water line installation kits are available at extra cost from your retailer. We recommend
using a water line installation kit that contains copper tubing and a
1
/4" (6 mm)
compression nut.
A
B
C
1. Shut off the main water source.
2. Insert the pipe clamp (B) and the shutoff
valve (C) into the cold water line (A).
A
B
3. Connect the water line installation kit
(A) to the shutoff valve (B).
Dacor_T-TYPE_RF7000AC_DA68-04278M-00_EN.indd 32 2022-04-28 10:55:33