Installation guide

Hanging the Range Hood 7 Reattach the hood to the temporary mounting brackets.
8. Lift the hood into its final position and fasten it in place.
[_ WARNING Insert the fasteners through the mounting slots in the
back and top of the hood into the studs, mounting
Hanging the range hood requires _o people: Do not blocks or anchors.
attempt to lift the hood Without assistance: Duct Work Installation
1. Remove the plastic coating from the outside of the
hood.
2. Remove the filter(s) to reduce weight and avoid dam-
age.
3. Lift the hood up on both sides and slip the mounting
slots over the tabs on the mounting brackets.
[_ WARNING
During duct installati0n; make sure there are n0 I
obstructions that kee p the damper flaps on the top of the
hood from open ng.
Install the remote blower according to the remote blow-
er installation instructions.
i
i
i
i
2. Install the duct work starting from the hood and working
toward the remote blower. Observe the specifications
on page 7 and 8.
3. Fasten all joints with sheet metal screws and seal with
duct tape or certified silver tape.
Final Electrical Installation
,
,
6.
Lift the hood into its final position and mark the desired
locations for the anchors or wood screws through the
mounting slots on the back and top of the hood.
Remove the hood from the wall.
Drill the pilot or mounting anchor holes. If using mount-
ing anchors insert them into the mounting holes.
o I
I
I
,
,
,
,
[_ WARNING
To avoid electric shock or fire hazard, prior to con-
necting the electrical wiring to the hood, make sure
that power to the hood power supply line is turned off
at the fuse box or circuit breaker panel.
Improper connection of the hood electrical wiring may
create an electric shock or fire hazard and may result
in damage to the hood's electrical system. See page
6 for specifications.
Do not ground the hood to the neutral (white) power
supply wire. Connect the hood ground wire to a sepa-
rate, properly grounded wire installed by a licensed
electrician.
Make sure all wire used is capable of handling the
total connected load. See page 3.
Turn off power to the hood electrical circuit at the circuit
breaker or fuse box.
Run the conduit line used to supply power from the
hood to the remote blower parallel to the duct work.
Wire the remote blower according to the remote blower
or in-line installation instructions.
Connect the conduit to the hood and route the wires to
the terminal block inside the hood.
Route the power supply wiring from the junction box
to the hood. Feed the wiring through the wiring access
holes in the hood and route them to the terminal block
inside the hood.
Mounting Hole Locations
12 c_acar