INSTALLATION
10
• Your exhaust pipeline system must be
designed so that the pressure in the pipeline
during pump operation is less than 1.15 bar
absolute (1.15 x 10
5
Pa, 862 torr). If the
pressure in the pipeline is higher than this
pressure, the pump will operate at a high
temperature and may trip because of
excessive electrical current consumption.
• Ensure that debris (such as weld slag) cannot
get into the pump during operation.
If necessary, contact BOC Edwards or your supplier
for advice on inlet isolation-valves, outlet check-
valves or other components suitable for your
application and system design.
3.3 Unpack and inspect
1. Use a fork-lift truck or a pallet truck to place
the pallet in a convenient position.
2. Remove the cardboard sleeve which covers the
pump, then remove the protective foil bag from
around the pump.
3. Inspect the equipment. If the pump or any of the
other items is damaged, notify your supplier and
the carrier in writing within three days; state
the Item Number of the pump together with
your order number and your supplier’s invoice
number. Retain all packing materials for
inspection. Do not use the pump if it is
damaged.
WARNING
Use suitable lifting equipment to
move the pump. If you do not, you
can injure yourself or damage the
pump. Refer to Section 2.3 for the
mass of the pump.
4. Check that you have received the items listed in
Table 10. If any of these items is missing, notify
your supplier in writing within three days.
5. If the pump is not to be used immediately,
replace the packing materials. Store the pump in
suitable conditions as described in Section 6.1.
3.4 Locate the pump
Notes: If you will operate the pump in an environment
with an ambient temperature of 0
o
C (32
o
F)
or lower, contact your supplier or BOC
Edwards for advice.
Ensure that the cooling-air flow around the
pump-motor is not restricted.
1. Refer to Figure 1. Remove from the fixing-holes
(8) the four nuts and bolts which secure the
pump frame (9) to the pallet .
2. Attach suitable lifting-equipment to the four
lifting bolts (5) to move the pump.
3. Locate the pump on a firm, level surface. Ensure
that the surface is clean and free from debris
and contamination (such as oil).
4. Use suitable bolts through the four fixing-holes
(8) to secure the pump in position.
WARNING
Use suitable lifting equipment to
move the pump. If you do not, you
can injure yourself or damage the
pump. Refer to Section 2.3 for the
mass of the pump.
Quantity Description Check (✓)
1GV pump !
1 Fittings kit !
Table 10 - Checklist of items