Service manual

37
2) Steam heating
1The heater operates until the target water temperature is reached.
2Steam heating temperature setting
Course Temperature setting Time setting
Power saving 70ûC 15 min
Standard 75ûC 15 min
Strong 90ûC 20 min
3When the target temperature is reached, the time set for steam heating is reduced.
3) Steam washing
1The water temperature is maintained and the steam effect is maximized in this operation.
2Steam washing time
3The reserved washing v/v operates for three seconds every three minute to flow the water to the door glass.
4) Finishing steam water supply
1Steam washing is completed and it is advanced to the main washing) For this purpose, the same water level as the
general standard is achieved.
2The time set for water supply is one minute.
5) Finishing steam washing
1It is required when you failed to reach the target temperature in the main washing.
2The time set for water supply is 25 minutes.
6) Main washing
1Same as the general standard washing.
Course Temperature setting Time setting
Power saving 7 min 70ûC/75ûC
Standard 10 min 75ûC/80ûC
Strong 15 min 90ûC/95ûC
Strong 25 min 90ûC/95ûC