INSTALLATION MANUAL R410A Split Series Installation manual R410A Split series Models ARX20J!V1B ARX25J!V1B ARX35J!V1B English Installationsanleitung Split-Baureihe R410A Deutsch Manuel d’installation Série split R410A Français Montagehandleiding R410A Split-systeem Manual de instalación Serie Split R410A Manuale d’installazione Serie Multiambienti R410A !"#$%&ß'%( $")*+Ü,+*,-ò '%*%&(ýì$.
DAIKIN INDUSTRIES CZECH REPUBLIC s.r.
Safety Precautions • Read these Safety Precautions carefully to ensure correct installation. • This manual classifies the precautions into WARNING and CAUTION. Be sure to follow all the precautions below: they are all important for ensuring safety. WARNING...............Failure to follow any of WARNING is likely to result in such grave consequences as death or serious injury. CAUTION...............Failure to follow any of CAUTION may result in grave consequences in some cases.
Accessories Accessories supplied with the outdoor unit: (A) Installation Manual 1 (B) Drain plug (Heat pump-Models) (C) Refrigerant charge label 1 1 There is on the bottom packing case. (D) Multilingual fluorinated greenhouse gases label 1 Precautions for Selecting the Location 1) Choose a place solid enough to bear the weight and vibration of the unit, where the operation noise will not be amplified.
Outdoor Unit Installation Drawings Wrap the insulation pipe with the finishing tape from bottom to top. Max. allowable length 15m * Min. allowable length 1.5m Max. allowable height 12m Additional refrigerant required for refrigerant pipe exceeding 10m in length. 20g/m Gas pipe O.D. 9.5mm Liquid pipe O.D. 6.4mm * Be sure to add the proper amount of additional refrigerant. Failure to do so may result in reduced perfomance. CAUTION * The suggested shortest pipe length is 1.
Installation Guidelines • Where a wall or other obstacle is in the path of outdoor unit’s intake or exhaust airflow, follow the installation guidelines below. • For any of the below installation patterns, the wall height on the exhaust side should be 1200mm or less.
Outdoor Unit Installation 3. Flaring the pipe end. 1) Cut the pipe end with a pipe cutter. 2) Remove burrs with the cut surface facing downward so that the chips do not enter the pipe. 3) Put the flare nut on the pipe. 4) Flare the pipe. 5) Check that the flaring is properly made. (Cut exactly at right angles.) Remove burrs Flaring Set exactly at the position shown below. A Die A Flare tool for R410A Conventional flare tool Clutch-type Clutch-type (Rigid-type) Wing-nut type (Imperial-type) 0-0.
5. Purging air and checking gas leakage. • When piping work is completed, it is necessary to purge the air and check for gas leakage. WARNING 1) 2) 3) 4) Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle. When refrigerant gas leaks occur, ventilate the room as soon and as much as possible. R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment. Use a vacuum pump for R410A exclusively.
Outdoor Unit Installation 6. Refilling the refrigerant. Check the type of refrigerant to be used on the machine nameplate. Precautions when adding R410A Fill from the liquid pipe in liquid form. It is a mixed refrigerant, so adding it in gas form may cause the refrigerant composition to change, preventing normal operation. 1) Before filling, check whether the cylinder has a siphon attached or not. (It should have something like “liquid filling siphon attached” displayed on it.
Pump Down Operation In order to protect the environment, be sure to pump down when relocating or disposing of the unit. 1) 2) 3) 4) Remove the valve cap from liquid stop valve and gas stop valve. Carry out forced cooling operation. After five to ten minutes, close the liquid stop valve with a hexagonal wrench. After two to three minutes, close the gas stop valve and stop forced cooling operation.
Wiring WARNING 1) Do not use tapped wires, stranded wires, extension cords, or starburst connections, as they may cause overheating, electrical shock, or fire. 2) Do not use locally purchased electrical parts inside the product. (Do not branch the power for the drain pump, etc., from the terminal block.) Doing so may cause electric shock or fire. 3) Be sure to install an earth leakage breaker. (One that can handle higher harmonics.
CAUTION When connecting the connection wires to the terminal board using a single core wire, be sure to perform curling. Problems with the work may cause heat and fires. Strip wire end to this point. Good Excessive strip length may cause electrical shock or leakage. Wrong Stripping wire at terminal block 3) Pull the wire and make sure that it does not disconnect. Then fix the wire in place with a wire stop.
Test Run and Final Check 1. Trial operation and testing. 1-1 Measure the supply voltage and make sure that it falls in the specified range. 1-2 Trial operation should be carried out in either cooling or heating mode. ■ For heat pump • In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temperature. 1) Trial operation may be disabled in either mode depending on the room temperature.
MEMO 12 ■Portugues
MEMO ■Portugues 13
MEMO 14 ■Portugues
U Nove hospody 1/1155, 301 00 Plzen Skvrnany, Czech republic Zandvoordestraat 300, B-8400 Ostende, Belgium www.daikineurope.