Service Manual

SiUS091133 Control Specification
Function and Control 52
3.11.1 Fully Closing with Power ON
The electronic expansion valve is initialized when turning on the power. The opening position is set
and the pressure equalization is developed.
3.11.2 Pressure Equalizing Control
When the compressor is stopped, the pressure equalization control is activated. The electronic
expansion valve opens, and develops the pressure equalization.
3.11.3 Opening Limit Control
Outline A maximum and minimum opening of the electronic expansion valve are limited.
Detail
The electronic expansion valve is fully closed when cooling operation stops, and is opened at a
fixed degree during defrosting.
3.11.4 Starting Operation Control
The electronic expansion valve opening is controlled when the operation starts, and prevents
superheating or liquid compression.
3.11.5 Control when the Frequency Changes
When the target discharge pipe temperature control is active, if the target frequency is changed to a
specified value in a certain time period, the target discharge pipe temperature control is canceled
and the target opening of the electronic expansion valve is changed according to the shift.
3.11.6 High Discharge Pipe Temperature Control
When the compressor is operating, if the discharge pipe temperature exceeds a certain value, the
electronic expansion valve opens and the refrigerant runs to the low pressure side. This procedure
lowers the discharge pipe temperature.
09/12 class 15/18 class 24 class 30/36 class
Maximum opening (pulse) 480 480 450 480
Minimum opening (pulse) 52 54 75 10