Installation manual
11 ■English
Refrigerant Piping Work
2. Refrigerant piping
CAUTION
•Usethearenutxedtothemainunit.(Topreventcrackingofthearenutbyageddeterioration.)
•Topreventgasleakage,applyrefrigerationoilonlytotheinnersurfaceoftheare.(UserefrigerationoilforR410A.)
•Usetorquewrencheswhentighteningthearenutstopreventdamagetothearenutsandgasleakage.
Alignthecentresofbotharesandtightenthearenuts3or4turnsbyhand.Thentightenthemfullywiththetorquewrenches.
Do not apply refrigeration
oil to the outer surface.
Flare nut
Apply refrigeration oil to
the inner surface of the
flare.
Do not apply refrigeration oil to
the flare nut to avoid tightening
with excessive torque.
[Apply oil]
Torque wrench
Piping union
Flare nut
Spanner
[Tighten]
Flare nut tightening torque
Gas side Liquid side
3/8 inch 1/4 inch
32.7-39.9N • m
(330-407kgf • cm)
14.2-17.2N • m
(144-175kgf • cm)
2-1. Caution on piping handling
1)Protecttheopenendofthepipeagainstdustandmoisture.
2)Allpipebendsshouldbeasgentleaspossible.Useapipebender
forbending.
Wall
If no flare cap is
available, cover
the flare mouth
with tape to keep
dirt or water out.
Be sure to
place a cap.
Rain
2-2. Selection of copper and heat insulation materials
•Whenusingcommercialcopperpipesandttings,observethefollowing:
1)Insulationmaterial:Polyethylenefoam
Heattransferrate:0.041to0.052W/mK(0.035to0.045kcal/mh°C)
Refrigerantgaspipe’ssurfacetemperaturereaches110°Cmax.
Chooseheatinsulationmaterialsthatwillwithstandthistemperature.
2)Besuretoinsulateboththegasandliquidpipingandtoprovide
insulationdimensionsasbelow.
Gas pipe
Liquid pipe
Gas pipe
insulation
Liquid pipe
insulation
Finishing tape
Drain hose
Inter-unit wire
Gasside Liquidside
Gaspipethermal
insulation
Liquidpipethermal
insulation
O.D.9.5mm O.D.6.4mm I.D.12-15mm I.D.8-10mm
Minimumbendradius Thickness10mmMin.
30mmormore
Thickness0.8mm(C1220T-O)
3)Useseparatethermalinsulationpipesforgasandliquidrefrigerantpipes.
01_EN_3P297034-1.indd 11 10/12/2011 11:37:08 AM