Unit installation

4Installation
Installationmanual
10
EGSQH10S18AA9W
DaikinAlthermagroundsourceheatpump
4P3517471B–2013.12
a c b
3 Routingofthewiringinsidetheunitshouldbeasfollows:
a c b
1x
1x
a c
≥50 mm
≥50 mm
1x 1x
c
a
≥50 mm
X5M
X2M
X1 X2 X3 X4
YC Y1 Y2 Y3 Y4
11 12
1x
1x
a c
NOTICE
Makesurethat50 mmisguaranteedbetweenthe low
voltage(a)andhighvoltage(c)cables.
Make sure that the cables (a) and (c) are routed
betweenthewireguideandthebacksideoftheswitch
boxtopreventwateringress.
4 Fix the cable with cable ties to the cable tie mountings to
ensurestrainreliefandtomakesurethatitdoesNOTcomein
contactwiththepipingandsharpedges.
Routing Possiblecables(dependingonunittypeandinstalledoptions)
a
Lowvoltage
Userinterface
Powerconsumptiondigitalinputs(fieldsupply)
Outdoorambienttemperaturesensor
Indoorambienttemperaturesensor(option)
Electricalmeters(fieldsupply)