User manual

©2012DaikinACSlide8
PUBLIC CONFIDENTIAL
DRAFT
InstallingtheDaikinENVi ThermostatKit
There are 6 steps to installing the Daikin ENVi thermostat kit:
Step 1. Power Off the Daikin Indoor Unit
WARNING: The Indoor Unit uses a high-voltage 208/230V power source. Always DISCONNECT power to the Indoor
Unit before connecting any power wires. Failure to do so can result in death, fire or electrical shock.
Step 2. Position and Wire the DPCA
Position the DPCA in a suitable location away from water near the Indoor Unit (for example, the backside cavity of a wall-
mounted unit). The DPCA is not plenum rated and should be mounted in a non-plenum space.
Step 3. Install the Daikin ENVi thermostat
The ideal location for the thermostat is approximately 5 ft (1.5 m) above floor level in the main living area.
Step 4. Connect the Thermostat Wiring
Use the field-supplied 4-wire low-voltage thermostat cable to connect the thermostat to DPCA.
Step 5. Mount the DPCA
After the necessary wiring connections are completed, mount the DPCA using the adhesive stickers or mounting screws
as needed.
Step 6. Power On the Daikin Indoor Unit
After the wiring is completed, power can be applied to the Daikin Indoor Unit.