Installation manual

Step 5. Mount the DPCA
After you make the necessary wiring
connections, mount the DPCA by using the
adhesive sticker or mounting screws as needed.
Step 6. Power On Daikin Indoor
Unit
After you’ve completed the wiring, you can
apply power to the Daikin Indoor Unit. The
Daikin ENVi thermostat receives power from the
equipment and will automatically power on.
After you power on the Indoor Unit:
1. Verify the green LED on the DPCA has turned
on. Upon verication, re-attach the DPCA
cover.
2. Use the wire ties to secure the wires as
needed.
13