Specifications

SiBE04-624_B Main Functions
Function and Control 25
Time chart for
humidifying
operation control
Approximately 1 minute after heating operation starts, humidifying operation and drying
operation repeats alternately to prevent condensation inside the hose.
Humidifying trial operation has no 1-minute-delay, it immediately starts up from
(b’)
, and
works in the same sequence as normal humidifying operation.
Humidifying trial operation automatically stops after about 30 minutes.
Note: In a room that is spacious such as loft style or partitioned by an accordion style curtain, the
ventilation volume is large and sometimes may not reach the set humidity.
(a): Humidifying time Approx. 70 min.
According to the outdoor temperature and the
hose length set by remote controller
(b): Drying time Approx. 2~10 min.
According to the hose length set by remote
controller
(b’): Drying time Approx. 2~10 min.
ON
OFF
ON
OFF
ON
OFF
Heater
ON
OFF
ON
OFF
Approx. 1 min. +
Approx. 3 min.
15 sec. 15 sec.
Drying
(b') (b')(a) (a) (a)(b) (b)
(R18142)
Heating
operation
Humidifying
fan damper
Hygroscopic
fan
Humidifying
rotor