Service Manual

SiUS071735E
111 Trial Operation and Field Settings
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation............................................................................112
2. Forced Cooling Operation .......................................................................113
3. Trial Operation ........................................................................................114
4. Field Settings ..........................................................................................117
4.1 How to Change the Field Settings............................................................ 117
4.2 Overview of the Field Settings.................................................................. 120
4.3 MAIN/SUB and Address Setting for Wireless Remote Controller ............ 121
4.4 Facility Setting (cooling at low outdoor temperature) ............................... 123
5. Silicone Grease on Power Transistor/Diode Bridge................................124