User manual
[Setup → Grid management]
Set up ancillary services such as Power Level Adjustment (PLA) and Reactive Power in this area.
6.6.1.
General
[1] [Plant]
Illustration 6.14: General
Item Description
Nominal plant AC power Enter the total nominal AC power for the entire plant. This value is necessary for
correct calculation of the absolute reactive power Q.
Q and PF settle time Enter the system settling time for reactive power regulation.
Range: 10 – 60 seconds.
Control type Specifies whether the control should be Open loop (enabled) or Off (disabled).
Reference value Select a reference for reactive power
• Grid management box
• Reactive power Q
• Power factor PF
• Set point curve PF(P)
• Set point curve Q(U)
Grid management box
• The grid management box receives set point values for reactive power and PLA from
the DNO. Configure the grid management box inputs under: Relay configuration. For
more information refer to the TripleLynx CN Reference Manual and the Grid Manage-
ment Box Manual.
Reactive power Q
• Enter the fixed set point value for the plant reactive power Q as either:
- percentage value of the nominal plant AC power (%)
Range: 0 – 60% of the nominal plant AC power, over-excited or under-exci-
ted.
- value of Q (kVAr)
Power Factor PF
Enter the fixed set point value for the plant power factor.
Range: 1 – 0.8 over-excited or under-excited.
Set point curve PF(P)
The power factor is defined as a function of the plant output power. Enter the values for the set
point curve under:
PF(P) Curve
.
6. Setup
L00410583-01_02 39
6