Full Product Manual

Page 17
For technical questions, please call 877.432.6627
POST-INSTALLATION CHECK-OFF
; Columns Properly Shimmed And Stable Anchor Bolts Tightened (Optional)
; Pivot / Sheave Pins Properly Attached
; Electric Power Supply Confirmed
; Cables Adjusted Properly
; Safety Locks Functioning Properly
; Slack Cable Safety secure and engaged.
; Check For Hydraulic Leaks
; Oil Level
; Lubrication of Critical Components (Cables, Pulleys, Inside Columns, and all other moving parts)
; Check For Overhead Obstructions
; Runways Level
; All Screws, Bolts, and Pins Secured (Re-install Safety Cover)
; Surrounding Area Clean
; Operation, Maintenance and Safety Manuals on Site
; Cylinder Nut secure.
; Runway Pulley set screws secure.
; All Lift Operators have read this manual