CONCRETE SPECIFICATIONS
10,000-lb 2-Post Lift Models Require 4-inch Min. Thickness / 3,000 PSI Steel Reinforced.
IMPORTANT NOTE:
All models MUST be installed on 3,000 PSI concrete only conforming to the minimum requirements
shown above. New concrete must be adequately cured by at least 28 days minimum. Dannmar lifts are
supplied with installation instructions and concrete fasteners meeting the criteria as prescribed by the
american national standard “automotive lifts safety requirements for construction, testing, and validation”
ANSI/ALI ALCTV-2006. Lift buyers are responsible for any special regional structural and / or seismic
anchoring requirements specified by any other agencies and / or codes such as the uniform building
code (ubc) and / or international building code (ibc).
STEP 3
(Column Preparation)
COMPLETE THE FOLLOWING PRIOR STANDING UP COLUMNS.
1. Slide carriage up column to aid in pulley removal and equalizer cable routing. (See figure 1)
2. Remove equalizer cable pulley. Route the plug end
of each equalizer cable around the bottom pulley
and lock into bottom plate of carriage. (See figure 2)
Note: On symmetrical models both cables are same
length. On asymmetric models the cables are two
different length’s. The shorter cable on the asym-
metric models will be pre routed on the powerside
post and the longer cable will be pre routed on the
offside post.
3. Feed threaded end of cable up through carriage.
Leave excess cable resting on top of carriage until
further steps are required. (See figure 3)
4. Install the cylinder fittings in cylinder ports. Pay at-
tention when installing the cylinders in step three to
ensure that each fitting points towards the entrance
side of lift.