Instructions / Assembly

VISIT US ON THE WEB AT WWW.DANNMAR.COM
18
STEP 8
(Mounting the Power Unit)
1. Attach the power unit and vibration pad to the powerside column using four M8 x 25mm hex bolts and
nylock nuts supplied. (See figure 9)
2. Fill the reservoir with 12 quarts of Aw-32 hydrau-
lic oil or Dexron III or VI transmission fluid. Be
sure to use a clean funnel.
Step 9
(Installing the Safety System)
1. Install safety weldments into each respective
column. (See figure 10 & 11)
2. From the offside column insert the non looped
end of the safety cable through the slot located
to the right of the offside safety weldment and
route under the pulley and take it up to the top
trough. (See figure 12 on next page)
3. Route the cable through the top trough safety
cable pulley(s) and across the lift. (See figure 13
& 14 on next page)
4. Route the cable the same way on the powerside going back down the column.
5. Route the cable over the top pin on the safety handle. Insert the cable end through the hole on the
threaded post. (See figure 15 on next page)
6. Pull the slack out the safety cable and hold tension as the cable is being tightened. Tighten jam nuts
on either side of the cable to secure it into place. This will need to be repeated monthly as the cable
stretches.
Fig: 9
POWERSIDE
SAFETY
Fig: 10
OFFSIDE
SAFETY
Fig: 11