Instructions / Assembly
VISIT US ON THE WEB AT WWW.DANNMAR.COM20
Fig: 17
Retaining
ring
welded inside each column. Make sure that the hose is clear
of any moving parts. It may be necessary to tie the hose
clear by using nylon tie straps or wire. (See figure 17)
STEP 11
(Routing the Equalizer Cables)
Refer to the illustration on page 22
1. Raise and lock each carriage approximately 28” above
the ground.
2. With the carriages locked at 28” off the floor, route the equalizer cables up to the top trough.
Make sure that the safety locks on each column are fully engaged before attempting to route equalizer
cables. Carriages must be equal height from the floor before proceeding.
3. Route the cables through the pulley brackets and reinstall the pulleys. (See figure 18)
Note: the pulleys should
have been removed in
step 6.
4. Insert the threaded
end of the cable
through the hole on
top of the carriage.
Place the M-18 wash-
er and the M-18 nylon
lock nut on threaded
cable end. Tighten
cable nuts until taut,
checking that both
cables have equal ten-
sion. (See figure 19)
DANGER
Fig: 18
NOTE: Pulley
plate removed
for clarity.
Fig: 19
Bulkhead
fitting
Crossover
hose
Powerside
hose
Fig: 16
Shown with
breakout to
show bulkhead