Instructions / Assembly
VISIT US ON THE WEB AT WWW.DANNMAR.COM26
8. Adjust the gear ring on the arm as necessary to ensure
smooth operation and solid engagement of all four arm
restraint pin assemblies with the arm restraint gear ring.
Each arm restraint assembly must be inspected and
adjusted as needed before each and every time the lift
is operated. Do not operate the lift if any of the four arm
restraint systems are not functioning properly. Replace
any broken components or components with broken teeth
only with authorized or approved replacement parts.
STEP 16
(Leveling Instructions)
1. Before operating your lift, check to make sure that both “A” and “B” measurements are equal. (See
figure 31)
2. Lift arms must be level before operation, if your lift arms are not level shim the columns as required.
(See figure 7 on page 17)
IMPORTANT NOTE:
The equalizer cables should be checkecd weekly for equal tension. Failure to do this will cause uneven
lifting. The cables should always be adjusted so that they are equal tension when resting on the safety
locks.
Fig: 30
DANGER
B
A
Fig: 31