User's Manual

Zhone 2800 Series FiberJACK ONT Installation
38 Zhone 2800 Series FiberJACK ONT Hardware Installation Guide
Install the FiberJACK ONT
This section describes the procedures for installing the FiberJACK ONT. The
FiberJACK ONT comes complete with all hardware for installation into a
standard single-gang electrical wallbox with 3.25 inches between vertical
mounting holes. A metal wallbox should be used. This installation guide
applies to FiberJACK ONTs that are AC powered or DC powered.
zNID 2800P series FiberJACK ONT installation overview
Figure 14: Exploded view of FiberJACK ONT installation with 3 pin connector
1 Select location for the FiberJACK ONT
2 Provide power to the wallbox
There are different power connection steps depending on whether
connecting to AC power, DC power from PoE, or two-wire DC power.
3 Provide fiber to the wallbox
4 Connect power and the fiber
5 Secure the FiberJACK ONT to the wallbox
6 Attach the FiberJACK ONT faceplate
7 Connect subscriber services