Installation manual
150 Production Options Setup
combined with the selection of emboss group number in Card Setup which will 
modify system behavior.
In the example above, the first and second emboss modules will be gang 
candidates and the remaining modules (three, four and five) will operate 
independently if so assigned in Card Setup.
The Production Options change alone has no effect. User control also requires a 
selection of one of the emboss groups in Card Setup in order to have any level of 










