Technical information

AccuLazr™ AL5010 Product Line Manual Electrical Installation 45
Electrical wiring sequence:
1. SCANNER - Mounting base
(two connections, 15-pin ‘D’ and RJ-45)
Cable Jacket Stripping Strip All Wires
2. ETHERNET - Host (Network)
3. COM 1 / COM 2 - Serial communications
COM 1 = 3 1/2”, COM 2 = 3” 1/4”
4. FIELDBUS (DeviceNet or Profibus, optional)
4 3/8” 1/4”
5. TRIG – Trigger
3 1/2” 1/4”
6. TACH – Tachometer
3 1/4” 1/4”
7. POWER - Power supply or user-supplied
2 3/4” 1/4”
8. I/O 1 through I/O 4 - I/O module(s) (optional)
2 1/2” 1/4”
Wiring Installation Sequence (Connection Panel)
Wiring Installation Sequence (Circuit Board) and TB Wiring Tables
04-AL5010_Electrical_Installation_R20.doc Accu-Sort Systems, Inc.