User manual

1
Mounting Pole Kit
Installation Manual
This manual covers use of the Mounting Pole Kit with the Integrated Sensor
Suite (ISS) of the Vantage Pro2
TM
system. The kit can also be used with
other Davis Instruments stations, applying the principles shown here with
the ISS.
Components
The mounting kit includes the following:
Tools and Materials Needed
In addition to the hardware shown above, you may need some of the
following tools and materials:
Adjustable wrench
Drill with 1/4" (6 mm) bit
Secure the ISS to the Support Tube
The support tube is 19-1/2" (0.5 m) long, and has a swaged end. After you
secure one or both sides of your ISS to the support tube, this end will be
8" Cable Ties
1-1/2" Saddles
1-1/2" Saddle
5/16" Flat Washers
5/16" Flat Washers
Extension Tube (21" long)
Support Tube
(19.5" long, swaged end)
5/16" x 1-1/2"
U-Bolt
5/16" Lock Washers
5/16" Hex Nuts
5/16" x 3"
Lag Screws

Summary of content (4 pages)