Operating instructions
Form 5S6059
Printed in China
09663
0510/222/VCPVP
GGS #119
2012-05-31
®
Dayton
®
Propane
Construction Heater
Operating Instructions & Parts Manual 3VE59C
Please read and save these instructions. Read carefully before attempting to assemble, install, operate or maintain the product described. Protect yourself and
others by observing all safety information. Failure to comply with instructions could result in personal injury and/or property damage! Retain instructions for
future reference.
Description
Dayton Model 3VE59C heaters are 300,000 BTU/Hr construction heaters. This heater
uses propane gas for combustion, and electricity to run the fan. It is primarily
intended for temporary heating of well-ventilated buildings under construction,
alteration or repair. This heater should be utilized in sheltered, well-ventilated
areas, but never in occupied dwellings.
Specifications
Figure 1 – Model 3VE59C
GENERAL SPECIFICATIONS
Output Rating Maximum Fuel Regulator
Model BTU/Hr Fuel Consumption Ignition Outlet Pressure
3VE59C 300,000 Propane Vapor Only 13.9 Lbs/Hr Direct spark, interrupted 7-10 PSIG
Hot Air Output Minimum Supply Maximum Supply Size Weight
Model Approx. (CFM) Motor Pressure to Regulator Pressure to Regulator L x W x H (Inches) (pounds)
3VE59C 1800 0.085 HP 25 PSIG (for purposes Max. Bottle Pressure 33.7 x 12.6 x 18.5 33.9 (Heater)
1,720 RPM of input adjustment) 42 (Shipping)
ELECTRICAL SPECIFICATIONS
Model Electrical Input Amperage
3VE59C 120 V, 60 Hz 0.65
Table of Contents Page
Description .......................1
Specifications......................1
Unpacking ........................1
General Safety Information ........1-3
Theory of Operation................3
Installation......................3-4
Ventilation........................4
Operation ......................4-5
Maintenance ....................5-6
Storage ..........................6
Wiring Diagram....................6
Repair Parts Illustration
and Parts List ....................8-9
Troubleshooting Chart ............ 10
Warranty ....................... 10
Unpacking
1. Unpack all materials used to protect
the heater inside of carton. Retain
plastic caps attached to exposed
fitting for use during storage.
2. Remove heater, accessories and all
hardware from carton.
3. Inspect all items for damage that
may have occurred during shipment.
General Safety Information
Be sure to read and understand
all cautions and warnings, before
operating this heater. Keep this
instruction manual for future reference,
and use it as a guide to safe and proper
operation of the heater.
Various precautions appear throughout
this manual. Please review and pay close
attention to them. Below is an explana-
tion of the various levels of caution
required while operating this heater.
Indicates an im minen-
tly hazardous
situation which, if not avoided, WILL
result in death or serious injury.
Indicates a poten tially
hazardous situation
which, if not avoided, COULD result in
death or serious injury.
Indicates a poten tially
hazardous situa tion
which, if not avoided, MAY result in
minor or moderate injury.
IMPORTANT: Every possible situation
that may involve a hazard cannot
be anticipated. The warnings in this
manual, and on the heater itself can-
not be all inclusive. If an operating
technique or procedure that is not
specifically recommended by Dayton
is used, you must assure that it will be
safe for you and anyone else within
the heated space. You must be sure
that the heater will not be damaged
or made unsafe by your handling of
the maintenance or operation of
the heater.
Consumer: Retain this manual for
future reference.
E
N
G
L
I
S
H
E
S
P
A
—
O
L
F
R
A
N
Ç
A
I
S
GHP Group, Inc.
8280 Austin Avenue
Morton Grove, IL 60053
CSA 2.14b-2009, ANS Z83.7b-2009 Construction Heater
C US
C US










