Installation Guide
INSTALLATION GUIDELINES
1 | P a g e A M 0 0 4 – D e c - T e c D I Y I n s t a l l a t i o n G u i d e – v.03
© Skyline Building Systems Inc., 2022
OVERVIEW
Dec-Tec DIY
is a highly durable, water-resistant membrane and designed for convenient do-it-yourself,
residential installations and is great for use on outdoor decks and high traffic areas. Dec-Tec DIY
is
simple to install over plywood, concrete, or existing vinyl substrates with no adhesives required. The
covered surface is ready for foot traffic immediately after installation.
• Realistic high-end aesthetics
• Easy peel and stick installation
• Easy to clean and maintain
• Pet friendly
• Scratch and scuff resistant
• No adhesives required
• Factory applied adhesive backer for quality assurance
• No thermal or chemical welding required
• No cure time
• High UV resistance
• High traction
• Unprecedented dimensional stability
• Will not delaminate
• Install in temperatures as low as 34
o
F or 1
o
C
These installation guidelines should be followed for an ideal installation.
Additionally, please visit the Dec-Tec DIY YouTube channel for installation videos:
Dec-Tec DIY YouTube Channel
STORAGE AND HANDLING
• Protect product edges and corners from damage. Deformed materials or edges can result from
improper handling or storage and could prevent proper bonding and fitting.
• Material must be stored laying flat and never on edge.
• Store in a cool, dry location and keep away from excessive heat.
• Tarp and keep elevated and dry if stored outdoors.
• Material must be acclimated to the installation area for a minimum of 24 to 48 hours prior to
installation.
TOOLS AND MATERIALS
Basic hand tools and materials:
• Tape measure
• Carpenters pencil
• Chalk line
• 4-inch putty knife







