Installation Guide

INSTALLATION GUIDELINES
1 | P a g e A M 0 0 4 D e c - T e c D I Y I n s t a l l a t i o n G u i d e v.03
© Skyline Building Systems Inc., 2022
OVERVIEW
Dec-Tec DIY
is a highly durable, water-resistant membrane and designed for convenient do-it-yourself,
residential installations and is great for use on outdoor decks and high traffic areas. Dec-Tec DIY
is
simple to install over plywood, concrete, or existing vinyl substrates with no adhesives required. The
covered surface is ready for foot traffic immediately after installation.
Realistic high-end aesthetics
Easy peel and stick installation
Easy to clean and maintain
Pet friendly
Scratch and scuff resistant
No adhesives required
Factory applied adhesive backer for quality assurance
No thermal or chemical welding required
No cure time
High UV resistance
High traction
Unprecedented dimensional stability
Will not delaminate
Install in temperatures as low as 34
o
F or 1
o
C
These installation guidelines should be followed for an ideal installation.
Additionally, please visit the Dec-Tec DIY YouTube channel for installation videos:
Dec-Tec DIY YouTube Channel
STORAGE AND HANDLING
Protect product edges and corners from damage. Deformed materials or edges can result from
improper handling or storage and could prevent proper bonding and fitting.
Material must be stored laying flat and never on edge.
Store in a cool, dry location and keep away from excessive heat.
Tarp and keep elevated and dry if stored outdoors.
Material must be acclimated to the installation area for a minimum of 24 to 48 hours prior to
installation.
TOOLS AND MATERIALS
Basic hand tools and materials:
Tape measure
Carpenters pencil
Chalk line
4-inch putty knife