Installation Guide

www.deckorators.com
1.1.20
Deckorators
®
ALX Contemporary Cable
Installation Instructions for Level Runs
A. Drill Posts
Hole size for 1/8" or 3/16" dia. cable installation
Tools Required for Installation
Pull-Lock
®
Fitting
with cap
Stainless
Steel
washer
for wood
Stainless
Steel
washer
for wood
Delrin
®
washer
Stainless Steel
washer for metal
Brass
locknut
Stud
bushing
1x19
stainless steel
cable
Pre-attached
Threaded
Stud
with cap
29/64”
dia.
1¾” minimum
29/64”
dia.
29/64”
dia.
9/32”
dia.
1/4”
dia.
5/32”
dia.
5/32”
dia.
5/32”
dia.
5/32”
dia.
1½” minimum
Minimum 1.9”
Metal Post
Minimum 4” x 4”
Wood Post
2 ” minimum
5
8
7/32”
dia.
7/32”
dia.
7/32”
dia.
7/32”
dia.
Hole size for
Intermediate Posts for
1/8” dia. cable
passing cable only
Hole size for
Intermediate Posts for
3/16” dia. cable
passing cable only
For Intermediate Post
passing cable through
CS Tube side
(wood post only)
For End Post using
Pull-Lock
®
fitting
For End Post using
Threaded Stud
• 5/32" Drill Bit
• 1/4" Drill Bit
• 29/64" Drill Bit
• 1/8" Hex Wrench
Cut-off Tool
Used to cut cable flush with the end of the
Pull-Lock
®
fittings, and to cut excess threads
off stud-type Receivers. Includes mandrel
and two cut-off wheels.
7/16" Wrench
• RFXPL-KEY
• Cut Off Kit (mandrel)
• Cut Off Kit (wheel)
NOTE: Parts must be kept clean and free of debris
before installation for best results.

Summary of content (8 pages)