Manual
DECOTRUSS.DOC
7/7
The maximum drop distance must never exceed 20 cm.
A safety rope which already hold the strain of a crash or which is defective must not be used again.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
Mounting Instructions
Parts of DECO-TRUSS have to be connected with three conusses each. It is very important that all
connection-tubes are fixed in the tubes and the screws are tightened. Please read the information below.
Important:
Please check on a regular basis all parts of DECO-TRUSS for damage and proper connections. Damaged
DECO-TRUSS parts must not be used anymore! Every change at the trussing (new drillholes are also
considered to be changes) will also change the statics and structural characteristics and must be inspected
by a structural engineer.
Important! Must be read and applied!
With several pieces you can build a complex construction. Please pay attention to ensure a proper
connection between two or more pieces and obey the structural regulations for one or more pieces. This may
vary depending on the construction purpose and place.
♦ Please get the construction inspected and load-calculated. The load-capacity of one piece or the whole
system depends on a number of details like punctual load, distributed load, wind load or even more
specific loads of your specific construction, so a specialist has to calculate your design.
♦ There may be special governmental regulations for building constructions. For use in public places
(theatres, discos, stages) you have to apply special technical regulations depending on the purpose.
♦ In case a DECO-TRUSS piece or system is used above the public, or if people can move or stand below
the DECO-TRUSS construction, you have to check if this is allowed at this site.
♦ Building DECO-TRUSS constructions can mean very high point loads, so please check the surface if it
can accept these loads.
♦ Please check special regulations for DECO-TRUSS usage with stands and motors.
Above mentioned regulations shall inform you of the duties of a constructor or user of a trussing, but may not
be complete. Depending on the place or purpose of the usage there could be more rules and regulations to
obey.
To follow these rules and regulations it might be necessary to get the construction inspected and approved
by a governmental representative or /and a structural engineer. Depending on the usage it might be
necessary to have the construction inspected on a regular basis by an engineer.
Please be informed that only you as an erector and also the user of a DECO-TRUSS piece or DECO-
TRUSS construction is responsible for following the structural and all other regulations. Please keep
this instruction and give a copy also to third parties, owners or users of the DECO-TRUSS piece or
DECO-TRUSS construction together with structural approvals, or, if necessary, the approvals of the
official authorities. For they are also responsible for following the regulations.
Please note: Every information is subject to change without prior notice. 09.03.2004 ©







