Operating instructions
14
GT 210 A 21/08/06 - 94863106 - 82274096E
Step 8
Assembling the outlet, return and draining tubes
`Coat the threaded and tapped connections of the sections,
tubes, plugs and thimble tubes with pipe dope (not supplied).
`Screw the 2 outlet and return tubes and the draining tube onto
the rear section.
`Screw the threaded plug with the thimble tube in the upper
connection and the other in the lower connection.
`On the front, install the two M10 pins in the holes designed for
that purpose.
Step 9
Assembling the door with right-hand opening
1 Put the lower hinge in place, press it against the front section and
fix it with an HM 10x50 screw + wide CL 10-20 tapered washer (17
mm wrench).
2 Assemble the other HM 10x50 hinge and wide CL 10-20 tapered
washer.
1
1
- for 4 and 5 section boilers use 1”1/4 NPT flow pipe.
Place the smaller threaded side to the outside.
- for 6 to 8 sections boilers use 1”1/2 NPT flow pipe. Place the
threaded side with the yellow marking to the outside.
The assembled body shall be tested with a water pressure of 90
psi (1,5 maxi working pressure).
8227N025B
17
1
2










