Operating instructions

17
21/08/06 - 94863106 - 82274096E GT 210 A
Step 14
`Close the door with the two special nuts (17 mm wrench).
Step 15
Assembling the flue gas nozzle
`Screw 2 M8 pins in the rear section.
The assembled boiler shall be subjected to a hydrostatic
test pressure not less than 1 1/2 times the maximum
allowable working pressure : 60 x 1.5 = 90 psi (with a
maximum of 99 psi) and during more than 10 minutes.
17
8227N029A
8227N030A
1