Operating instructions

20
GT 210 A 21/08/06 - 94863106 - 82274096E
Step 20
Installing the insulating material
`Place the insulating material around the body and fix it with two
straps.
`Put one strap on the front, underneath the control panel and the
other at the middle of the remaining part.
Step 21
`Place the two lower side pieces (with the round hole towards the
front and the oblong hole towards the back of the boiler).
`Install :
• to the front with a screw, serrated washer and nut,
• to the rear with a screw, LL washer and nut.
`Screw the screws tightly into the notch of the front height
converters.