Operating instructions
23
21/08/06 - 94863106 - 82274096E GT 210 A
Step 26
`If the boiler is connected to the installation, cut the panel with
cutting pliers along the cut-outs.
`First assemble the lower part with four tapping screws and
serrated washers.
`Then clip on the upper part.
`If required, assemble the lower part once again to conceal the
cut edges.
`Install the upper part with four tapping screws and serrated
washers.
Step 27
Electrical connections:
The electrical connections shall be performed by a
qualified professional (see the instructions supplied with
the control panel).
Step 28
`Assemble the cover, placing it on studs A located on the front
and rear of the left and right-hand side panels.
`Install with four tapping screws and washers.
8227N041A
1
1
2
3
4
5
1
3
1
3
2
A
N042A
1
2










