Operating instructions
7
21/08/06 - 94863106 - 82274096E GT 210 A
Installation
1 Location
Sufficient space shall be left clear around the boiler for servicing and clearances to combustibles
The values provided in the drawings are in inches below are the minimum
recommended dimensions for providing easy access around the
boiler.
 Dimension 'X' consult burner + 24 inches for servicing.
To facilitate boiler installation, a handling tool (package BG 45, no.
8218-7723) may 
be used as shown opposite to move the heating
elements or place the boiler on the calorifier.
The two 3/4” or 1” pipes are not supplied.
L1
GT 214 A
29
11/16
GT 215 A
34
11/16
GT 216 A
39
11/16
GT 217 A
44
11/16
GT 218 A
49
11/16
19
11
/16
L1
X
19
11
/16
19
11
/16
22
38
7
/8
8227N058A
3/4"-1"
Boiler must not be 
installed on a 
combustible flooring or 
pad, do not install on 
carpet.










