Replacement Part List
12
30SD, 36SD, 45SD
Rev. Jan 2016
Assembly Instrucons
Step 7: Shi rod
The shi rod is preset at the factory, it connects the shi handle on the control panel to the transmission
shi assembly on the chassis.
1. Use the supplied hardware to connect
the at end of the shi rod to the
transmission shi assembly.
2. Connect the bent end of the shi rod to
the shi handle.
Need Help With Assembly?
(919)-550-3259
Shi rod
Step 8: Cleanout Tool and Mounng Bracket
1. Insert the mounng bracket bolts into the holes on the top of the auger housing and secure with the M8
nuts.
2. Snap the cleanout tool into the mounng
bracket.