Replacement Part List

12
30SD, 36SD, 45SD
Rev. Jan 2016
Assembly Instrucons
Step 7: Shi rod
The shi rod is preset at the factory, it connects the shi handle on the control panel to the transmission
shi assembly on the chassis.
1. Use the supplied hardware to connect
the at end of the shi rod to the
transmission shi assembly.
2. Connect the bent end of the shi rod to
the shi handle.
Need Help With Assembly?
(919)-550-3259
Shi rod
Step 8: Cleanout Tool and Mounng Bracket
1. Insert the mounng bracket bolts into the holes on the top of the auger housing and secure with the M8
nuts.
2. Snap the cleanout tool into the mounng
bracket.