User's Manual

Start-up
ALPRO ver 6.60/ Activity meter system
94118201.pdf2006-11-08
ALPRO ver 6.60/
Activity meter system
Start-up
Start up the Activity meter
system
A general start up including the following
four steps should be done before the
Activity meter system start up begins.
- Processor start up, as described in
ALPRO/General, chapter Start up.
- Introduction of cows to the system, as
described in ALPRO/General, chapter
Routine.
- Checking breeding parameters as
described in the Program description,
menu 6:1:3.
- Breeding data reported to the Cow
calendar, described in ALPRO Program
description, chapter 1:3 Breeding
The specific Activity meter system start up
includes:
To state the antenna addresses
To start the activity tags and hang them
on the cows.
State antenna adresses
6:1:6:1 ANTENNA GENERAL
ANTENNA GENERAL
NUMBER OF ANTENNAS: 2
START ADDRESS:
6
SYSTEM ALARM FOR ACTIVITY: YES
Enter the number of active antennas and
the start nod address. The adresses are set
in the receiver during installation. They must
follow in numerical order and the start
address is the lowest number.
The address range is 4 to 35 and the
default value is 6.
————————————————————
Note! Make sure that every node in the
system has an unique address.
17(60)