User's Manual

Quick Installation Guide Installation
deliberant Page 10
Step 3. Attach a mounting frame to the antenna grid (items E and B in the Figure 1 APC 2S-
20 Package Contents) together with the pipe and pipe’s frame details (items C and I in
the Figure 1 APC 2S-20 Package Contents) and fix them with four hexagon bolts,
spring washers and nuts (items M, N, R and O in the Figure 1 APC 2S-20 Package
Contents).
Step 4. Insert the UTP cable into the unit’s ETH port and fix the APC 2S-20 unit on the pipe
(items C and D in the Figure 1 APC 2S-20 Package Contents):