9dBi antenna professional installation instructions 1 Technical Parameters 19dbi antenna mainly apply to outdoor application scenarios, connect to outdoor AP 5GHz RF port by using a MCX type connector. Fig.
Below is the far-field pattern in horizontal direction and in vertical direction.
2 Safety Precautions Warning! Antenna installation is dangerous to some extent, please read over the below safety precautions before installation, so to avoid unnecessary injuries and deaths. Please set the antenna location far away from electricity such as power supply wire, street lamp or power supply box. Installer must pay attention not to touch the power supply wire, otherwise it may cause severe casualty. To choose a safe location where get far away from the power line or other cable.
Proper location to install 19dbi antenna. 19dbi antenna mainly used in outdoor such as top of building or top of the mountain. Generally speaking, the higher it be, the more area it will cover, so the more effective it will be.
Antenna Installation 19dbi antenna is packed with all kinds of spare parts, while other tools such as monkey wrench, cross screw driver and “-”type screw driver need to be prepared by yourself. 5.1 Installation Tools 1、monkey wrench 2、“+”type screw driver and “-”type screw driver 5.2 RF cable requirements Generally we adopt the RF cable as short as possible. We suggest adopting high quality and low loss RF cable.
5.3 Antenna installing steps. Assembling and Mounting the APC The APC 5M-90 units are supplied with mounting hardware for pole with diameters in the range 30mm to 55mm installations. Follow the steps for APC assembling: Step 1. Make sure that the APC unit is powered-off. Step 2. Open the unit’s cover and insert the UTP cable into the unit’s ETH port as displayed in the picture below: It is recommended to use shielded STP Ethernet cable to reduce exposure of the electromagnetic noise. Step 3.
Step 4. Attach the mounting hardware to the device: first fix mounting hardware part 1 with four Hex bolts M4x5 (items C and L in the Figure 1 – Package Contents), then attach the mounting hardware part 2 and fix it with four Hex bolts M5x10 (items D and K in the). It is recommended not to tighten the unit to its mounting bracket until the alignment process of the antenna is complete. Step 5. For wall mounting simply fix the unit’s mounting hardware on the wall with bolts (not included in the package).
Step 6. Ground the APC unit. The unit must be properly grounded to protect against lightning. The grounding wire must be attached to the grounding stud and tightened with the nut (item H in the): Step 7. Connect PoE and power cord (items F and G in the) together with UTP cables as displayed in the picture below: IMPORTANT: Deliberant APC 5M-90 maximum input voltage is 24V. Step 8. Power-up the unit. The green power LED must be on (refer at the respective section).
successfully. Step 9. After the link was established, align antenna for the maximum performance: loosen bolts on unit’s frame, run the Antenna Alignment tool in the Web management interface (or observe the RSSI LEDs) and move the unit in the vertical and horizontal panes until the maximum RSSI visible on the Antenna Alignment graph is achieved. After the maximum RSSI level is reached, tighten down frame’s bolts in the optimal position.
6 Antenna Power-level Setting This document provides mandatory radio power-level settings that must be configured to ensure that your device complies with regulatory requirements in your region. 6.1 Radio power-level setting 1.LOGIN he default product address is 192.168.2.66.
3 Different Frequency of the power setting 5150-5250MHZ:15dBi
5725-5850MHZ:23dBi
4 Select save and apply Click on the Save changes and apply.