User Instructions
5.3 Antenna installing steps.
Assembling and Mounting the APC
The APC 5M-90 units are supplied with mounting hardware for pole with
diameters in the range 30mm to 55mm installations. Follow the steps for
APC assembling:
Step 1. Make sure that the APC unit is powered-off.
Step 2. Open the unit’s cover and insert the UTP cable into the unit’s
ETH port as displayed in the picture below:
It is recommended to use shielded STP Ethernet cable to reduce exposure
of the electromagnetic noise.
Step 3. Close the unit’s cover and fix it with the cover’s bolt: