User Instructions

Step 6. Ground the APC unit. The unit must be properly grounded to protect
against lightning. The grounding wire must be attached to the grounding
stud and tightened with the nut (item H in
the
):
Step 7. Connect PoE and power cord (items F and G in
the)
together with
UTP cables as displayed in the picture below:
IMPORTANT: Deliberant APC 5M-90 maximum input voltage is 24V.
Step 8. Power-up the unit. The green power LED must be on (refer at the
respective section). Depending on link quality, up to four yellow LEDs
will switch on, indicating that link between two units was established