Installation Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
N3200-ON Series switch installation
To install the N3200-ON Series switch, complete the installation procedures in the order that is presented in this chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the N3200-ON Series switch and components. As with all electrical devices of this type, take all the
necessary safety precautions to prevent injury when installing this switch.
Topics:
• Unpack
• Rack or cabinet hardware installation
• Ground cable
• Desktop
• N3208PX-ON ceiling-mount switch installation
• N3208PX-ON wall-mount switch installation
• Standard bracket two-post installation
• Two-post five-inch-offset switch installation
• Two-post flush-mount switch installation
• Wall- or ceiling-mount switch installation
• One RU ReadyRails installation
• Optics installation
• Switch start-up
• After switch placement
• Switch replacement
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the switch, ensure that the following items are included:
● One N3200-ON Series switch
● One RJ45 to DB-9 female cable
● One MicroUSB console cable
● Two sets of rack mounting brackets and screws—except N3208PX-ON
● Four rubber feet
● N3208PX-ON only—ceiling or wall mount tray and screws
● N3208PX-ON only—one wire clip for the power connector
● One pluggable AC PSU (second AC PSU if ordered)—except N3208PX-ON
● One or two pluggable DC PSUs, if ordered
● DC only: Ground lug and screws—except N3208PX-ON.
● Three pluggable fan units, except N3208PX-ON
● (Optional) N3208PX-ON only—two external power adapters
● One AC power cable; country or region specific
● DC only: DC power cable
● N3200-ON Series Quick Setup Guide
● N3200-ON Series Warning Guide
● Safety and Regulatory Information
● Warranty and Support Information
4
24 N3200-ON Series switch installation