Installation Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
wall- or ceiling-mount tray
2. Screw the DIN buckles to the bottom of the wall- or ceiling-mount tray using three screws for each DIN buckle.
3. Slide the switch into the wall-mount tray.
4. Line up the two mushroom-head hooks on the switch to the tray hook cutouts until the switch locks into place.
5. Fix the switch to the tray using two screws on each side.
6. Snap the two DIN buckles into the DIN rails.
30
N3200-ON Series switch installation