Installation Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
Management ports
The N3200-ON Series switch provides two ports for management and one USB flash drive mount for file transfers.
NOTE: The output examples in this section are for reference only. Your output may vary.
Topics:
• RJ45 console port access
• MicroUSB Type-B console port access
• USB storage mount
RJ45 console port access
For the N3200-ON Series switch, the management ports are on the I/O-side of the switch.
N3208PX-ON management ports
1. Out-of-band management port (right), RJ45 console port (left)
N3224F-ON management ports
1. Out-of-band management port (right), RJ45 console port (left)
N3224P-ON, N3224T-ON and N3224PX-ON management ports
8
Management ports 69