Installation Guide
Table Of Contents
- Dell EMC PowerSwitch N3200-ON Series Installation Guide
- About this guide
- N3200-ON Series switch
- Site preparations
- N3200-ON Series switch installation
- Unpack
- Rack or cabinet hardware installation
- Ground cable
- Desktop
- N3208PX-ON ceiling-mount switch installation
- N3208PX-ON wall-mount switch installation
- Standard bracket two-post installation
- Two-post five-inch-offset switch installation
- Two-post flush-mount switch installation
- Wall- or ceiling-mount switch installation
- One RU ReadyRails installation
- Optics installation
- Switch start-up
- After switch placement
- Switch replacement
- External power adapter
- Power adapter holder assembly
- Wall or ceiling installation
- DIN rail installation
- Single-EPA and switch four-post installation
- Single-EPA and switch two-post center-mount installation
- Single-EPA and switch two-post front-mount installation
- Dual-EPAs two-post front-mount installation
- Dual-EPAs two-post center-mount installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
Installation using ONIE
This section describes uninstalling an operating system and installing ONIE on your switch. For more information, see switch-
specific information at www.dell.com/support.
NOTE: Before you install an operating system, ensure that the switch has the most current ONIE and firmware version. To
upgrade your switch, go to the Drivers and Downloads page for your switch at www.dell.com/support.
Topics:
• Before you install an operating system
• Check your switch
• Uninstall an existing OS
• Install a NOS
Before you install an operating system
After powering on the N3200-ON Series switch, it goes through a power-on self-test (POST).
POST runs every time that the switch is initialized and checks the hardware components to determine if the switch is fully
operational before booting. After POST, the switch uses the Grub bootloader.
To select an entry, use the up and down arrow keys. Press Enter to select an operating system or enter e to edit the
commands before booting. Enter c for a command line. The selected entry runs automatically in the operating system.
Grub bootloader example
GNU GRUB version 2.02~beta2+e4a1fe391
+-------------------------------------------------+
|*ONIE: Install OS |
| ONIE: Rescue |
| ONIE: Uninstall OS |
| ONIE: Update ONIE |
| ONIE: Embed ONIE |
| EDA-DIAG |
| |
+-------------------------------------------------+
Your switch comes with ONIE installed.
NOTE: To access ONIE, use the RJ45 or MicroUSB console port.
ONIE options
ONIE: Install OS
For downloading and installing an OS from a URL
Starts ONIE with ONIE Discovery Service
(factory default boot)
ONIE: Rescue
Starts ONIE without ONIE Discovery Service
Useful for running Diagnostics manually
ONIE: Uninstall OS
Restore to factory defaults erases any installed OS
ONIE: Update ONIE
9
72 Installation using ONIE