Setup Guide

Resource Prerequisites
no shut
exit
S5000
Following is the prerequisite for S5000.
Enable Fibre Channel capability and Full Fabric
mode.
feature fc
fc switch-mode fabric-services
Enable FC ports connecting to Compellent
storage array and FC ports connecting to other
S5000 switch via ISL links.
interface range fi 0/0 - 7
no shut
Create DCB Map.
dcb-map SAN_DCB_MAP
priority-group 0 bandwidth 60 pfc
off
priority-group 1 bandwidth 40 pfc
on
priority-pgid 0 0 0 1 0 0 0 0
exit
Create a FCoE VLAN.
fcoe-map default_full_fabric fabric-
id <FCoE VLAN ID> vlan <FCoE VLAN
Id>
fc-map <FC MAP>
exit
NOTE: Following is the process of
generating the FC MAP.
For generating the fc-map use below ruby
code.
Here VLAN ID is FCoE VLAN ID.
fc_map =
vlanid.to_i.to_s(16).upcase[0..1]
fc_map.length == 1 ? fc_map =
"0EFC0#{fc_map}" : fc_map =
"0EFC#{fc_map}"
Compellent
Fault domain need to be created as per
Compellent best practices.
Prerequisites for Rack Server, S5000, and Compellent
The following table describes the prerequisites for the FCoE solution offered using Rack Server, S5000,
and Compellent. For more information, see http://en.community.dell.com/techcenter/extras/m/
white_papers/20387203
17