Administrator Guide

5. Use two people or an equipment lift to align the chassis rack-mount holes with the cage nuts in the
front posts (items 1 and 2 in Figure 8). Rest the chassis on top of the rack bar (or rack tray or
ReadyRails, if installed).
Figure 8. Aligning Rack-Mount Holes with 4-Post Rack Holes
16
Installing the Hardware