Users Guide

Linecard10 Boot Flash 3.3.1.16 3.3.1.18
Linecard11 Boot Flash 3.3.1.16 3.3.1.18
PE (0/0) Boot Flash 3.3.1.7 3.3.1.7
PE (0/1) Boot Flash 3.3.1.7 3.3.1.7
***********************************************************************
* Warning - Upgrading boot flash is inherently risky and should only *
* be attempted when necessary. A failure at this upgrade may cause *
* a board RMA. Proceed with caution ! *
***********************************************************************
Proceed Boot Flash image for all cards [yes/no]: yes
!!!!!!Sep 7 19:20:23: %RPM0-P:CP %DOWNLOAD-6-UPGRADE: PE 0 manual upgrade result - upgrade
success.
!!!!!
Bootflash image upgrade for all cards completed successfully.
Warning: Kindly save the system configuration before reloading.
Dell#
2 Use the upgrade system-image all command to upgrade the image in both the CB and the PE.
Dell#upgrade system-image all ftp: B:
Address or name of remote host []: 10.16.127.141
Source file name []: $w/Releases/E9.9.0/E9.9.0.0/FTOS-C9000-9.9.0.0.bin
User name to login remote host: admin
Password to login remote
host: !!!!!!!!!!!!!!!Sep 6
19:16:06: %RPM0-P:CP %KERN-6-INT: CP Mgmt port receiving excessive traffic; will be rate
controlled
- repeated 6 times
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!Sep 6 19:16:58: %RPM0-P:CP %KERN-6-INT:
CP Mgmt port receiving excessive traffic; will be rate controlled
- repeated 12 times
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!Sep 6 19:17:27: %RPM0-P:CP %KERN-6-INT: CP CPU receiving
excessive Management traffic: rx is suspended
!....!!!!Sep 6 19:17:36: %RPM0-P:CP %KERN-6-INT: CP Mgmt port receiving excessive traffic;
will be rate controlled
!!.........................!.................................................................
...
Image upgraded to CP.
!!!!!!!!!!!!!!%PE200-UNIT2-M:CP %DOWNLOAD-6-UPGRADE: Upgrade request received from
Controlling Bridge.
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!Apr 3 08:47:20: %RPM1-P:CP %DOWNLOAD-6-UPGRADE: PE 200 manual upgrade result -
upgrade success.
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
PE (200) Image upgraded successfully.
Image upgraded to RP, Standby RPM and all linecards.
3 Use the reload pe option to reload both CB and PE.
The above procedure brings up the devices in Dell Networking OS 9.10(0.0). To get a dual homing setup, you need to have a VLT
domain running in two systems with the same OS version. Refer to Setting up Dual Homing.
When you upgrade a standalone system to OS 10.0(0.0) and then connect a PE later, there might be a mismatch between the
versions. In this situation, the PE remains oine and the system displays the following:
Dell#
Apr 3 05:47:19: %RPM1-P:CP %DOWNLOAD-6-VERSION_MISMATCH_INFO: Received checkin from PE 200.
Expected version = 9-10(0-60) checkin version = 9.9(0.0)
Apr 3 05:47:20: %RPM1-P:CP %DOWNLOAD-6-UPGRADE_PROGRESS: PE 200 firmware auto sync is in
progress.
Apr 3 05:47:21: %RPM1-P:CP %BRM-5-PE_UNIT_DOWN: PE:200 Unit:2 Unit MAC:f8:b1:56:00:02:8a is
operationally down.
Apr 3 05:47:22: %RPM1-P:CP %BRM-5-BRM_LOG_PE_UNIT_VALIDATE_ERROR: PE:200 Unit:2 is in error:
Port Extenders (PEs)
747