User's Manual

Power Management 207
Viewing Power Budget Status
The CMC provides power status overviews of the power subsystem on the
Power Budget Status page.
Using the Web Interface
NOTE: To perform power management actions, you must have Chassis Control
Administrator privilege.
1
Log in to the CMC Web interface.
2
Select
Chassis
in the system tree.
3
Click the
Power Management
tab. The
Power Budget Status
page
displays.
Table 8-6 through Table 8-11 describe the information displayed on the
Power Budget Status page.
See "Configuring Power Budget and Redundancy" on page 213 for
information about configuring the settings for this information.
Using RACADM
Open a Telnet/SSH text console to the CMC, log in, and type:
racadm getpbinfo
NOTE: For more information about getpbinfo, including output details, see
"getpbinfo" on page 311.
Table 8-6. Real-Time Power Statistics
Item Description
Actual System AC Power
Consumption
Indicates the current cumulative AC power consumption
of all modules in the chassis measured from the AC input
side of the PSUs. Overall range: 0–7928 watts
Peak System Power
Consumption
Indicates the maximum system level AC power
consumption (in watts) since the value was last cleared by a
user. This property allows you to track the maximum power
consumption by the system (chassis and modules) recorded
over a period of time. To clear this value, click the
Configuration sub-tab of the Budget Status page.