Deployment Guide

Figure 6. Connecting servers ports to subnets (Converged solution-2 Node Direct Connect Configurations)
1. Intra-node Communication 2. External Communication
3. Management
Turning on the servers
Figure 7. Turning on the server power
Press the Power button on the system. The power indicator must glow.
NOTE: Do not turn on the storage enclosures at this time. The storage enclosure will be turned
on at a later stage in the deployment process.
17