Owners Manual

Figure 61. Installing the battery holder
Table 49. Assembly material
Description Quantity Torque (lbs/inch)
M3 Screw 3 6 ± 0.2
3 Position the cable to allow access for front-side routing.
4 Insert the battery into the holder and gently press it down until it is secured.
Installing and removing server components
107