Users Guide

Table 21. Installation Precautions (continued)
Do not expose the library to moisture.
Do not place a module on either the ends or sides as this
action might cause damage.
Complete these procedures to install your library hardware.
1. “Unpacking the Base Module and Expansion Modules” on page 36
2. “Identifying Library Module components” on page 40.
3. “Preparing top and bottom modules” on page 40.
4. “Installing modules in a rack” on page 43.
5. “Installing a tabletop module” on page 47.
6. “Aligning and connecting modules” on page 47
7. “Validating tape drive installation” on page 50.
8. “Connecting cables” on page 51.
9. “Powering on the library” on page 52
Complete these procedures to congure your library.
1. “The Initial Setup process” on page 53
2. “Initial conguration and customization” on page 54
3. “Labeling and loading tape cartridges” on page 54
4. “Verifying the installation” on page 56
5. “Advanced library conguration” on page 56
6. “Verifying the host connection” on page 58
Unpacking the Base Module and Expansion Modules
Procedure for safely unpacking the Base and Expansion Modules.
Before any modules are unpacked, clear a work surface near the targeted rack or table for installation.
Attention:
If the temperature in the room where the library operates varies by 15° C (30° F) from
where the module was stored, allow it to acclimate for at least 12 hours before it is unpacked.
Unpacking a Base Module or Expansion Module
1. Before a module is opened or removed from the box, inspect the container for shipping damage.
2. If you notice any damage, report it to the shipping company immediately.
3. Remove the module from the box.
Important: Lift the module out of the box by the long sides, not by the display.
36
Dell EMC ML3 Tape Library: User's Guide